Skip to main content

K&FCOPTEE Invisible Digital Hearing Aids For Seniors In Ear Rechargeable Sound Amplifiers

Brand: K&FCOPTEE

Convenient Volume Control:The hearing aids are equipped with a rotary button, allowing for easy volume adjustment. Unlike touch buttons commonly found in the market, this knob-type button eliminates the risk of accidental touches during daily activities, such as touching your hair. It provides a hassle-free experience for users.

Effective Hearing Aids:Suitable for mild to moderate hearing loss. Comes with excellent noise reduction processing to improve sound quality, so that you don't miss any beat in your life. JAIYINIDS Hearing Aids will bring you back to the world of clarity.

Invisible and Lightweight :This hearing aids small in size and light in weight. It can be better hidden in your ears without affecting the wearing of glasses, and is almost invisible. The soft earplugs fit the ear canal better, which make you feel comfortable

Long-lasting use:Our hearing aids come with rechargeable batteries. With a 3 hours charge, you can use your hearing aids for up to 20 hours of continuous use. The Charging Case with 80 hours of storage allows you to recharge your hearing aids up to 4 times. Say goodbye to the hassle of changing batteries and enjoy clear hearing all day long.

Packing Lists

Hearing Aids*2,

Charging Box*1

Charging Cable*1

Earplugs*6

Cleaning Brush*2

Manual*1

Why do my hearing aids whistle ?

Normally, Wearing our hearing aid in error result in the disturbing whistling or squeaking noise coming from device is caused by called feedback. We recommend that few simple steps as followed to reduce or eliminate noise:

The first, Please choose the appropriate ear domes according to the size of the ear canal and Make sure the "ear domes" fit snugly in your ear . If your hearing aids ear domes does not fit in your ear properly, sound will leak out and back into the devices microphone, causing the whistle sound.

The Second, Please clean your device with our brush every time . Our ears produce wax naturally to trap and expel foreign substances, but when you have wax build-up in your ears and insert your hearing aids on top of the wax, the sound coming out of the amplifier will be blocked and returned to the microphone, causing a squeal.

The Third, Adjust Volume Settings, Avoid setting the volume too high. High volume settings can sometimes cause echoes, try reducing the volume gradually.

The Last , Please store your device in clean Case, If the hearing aids microphone is covered with wax or debris, it will make a noise.

What to do if your hearing aids don't charge properly?

1. Check the hearing aids is correctly putted into the charging case.

 2.Make sure the charging case has enough power

Brand: K&FCOPTEE
Isin: IHXGV3GQLNHK

$109.96

  • Free shipping in US
  • Arrives:

  • Free 30-Day returns

In Stock

Sold by , Fulfilled By IBSPOT
Ships from USA

IBspot Buyer Protection

Shop confidently on IBspot, receive your item as described or your money back for eligible orders. Learn Program Terms

supported payment methods:Visa, Mastercard, Discover, Amex, Apple Pay, Google Pay

GUARANTEED SAFE CHECKOUT

More seller options

Starting from

Compare all sellers
  • MONEY BACK GUARANTEE

    30 days money back guarantee, no additional fee charged.

  • EXCELLENT SUPPORT

    We provide 24/7 online customer support via email.

  • Fast Shipping

    One week domestic shipping. Global delivery to the US in 2 weeks.

scroll to top arrow
K&FCOPTEE Invisible Digital Hearing Aids For Seniors In Ear Rechargeable Sound Amplifiers

K&FCOPTEE Invisible Digital Hearing Aids For Seniors In Ear Rechargeable Soun...

$109.96

Convenient Volume Control:The hearing aids are equipped with a rotary button, allowing for easy volume adjustment. Unlike touch buttons commonly found in the market, this knob-type button eliminates the risk of accidental touches during daily activities, such as touching your hair. It provides a hassle-free experience for users.

Effective Hearing Aids:Suitable for mild to moderate hearing loss. Comes with excellent noise reduction processing to improve sound quality, so that you don't miss any beat in your life. JAIYINIDS Hearing Aids will bring you back to the world of clarity.

Invisible and Lightweight :This hearing aids small in size and light in weight. It can be better hidden in your ears without affecting the wearing of glasses, and is almost invisible. The soft earplugs fit the ear canal better, which make you feel comfortable

Long-lasting use:Our hearing aids come with rechargeable batteries. With a 3 hours charge, you can use your hearing aids for up to 20 hours of continuous use. The Charging Case with 80 hours of storage allows you to recharge your hearing aids up to 4 times. Say goodbye to the hassle of changing batteries and enjoy clear hearing all day long.

Packing Lists

Hearing Aids*2,

Charging Box*1

Charging Cable*1

Earplugs*6

Cleaning Brush*2

Manual*1

Why do my hearing aids whistle ?

Normally, Wearing our hearing aid in error result in the disturbing whistling or squeaking noise coming from device is caused by called feedback. We recommend that few simple steps as followed to reduce or eliminate noise:

The first, Please choose the appropriate ear domes according to the size of the ear canal and Make sure the "ear domes" fit snugly in your ear . If your hearing aids ear domes does not fit in your ear properly, sound will leak out and back into the devices microphone, causing the whistle sound.

The Second, Please clean your device with our brush every time . Our ears produce wax naturally to trap and expel foreign substances, but when you have wax build-up in your ears and insert your hearing aids on top of the wax, the sound coming out of the amplifier will be blocked and returned to the microphone, causing a squeal.

The Third, Adjust Volume Settings, Avoid setting the volume too high. High volume settings can sometimes cause echoes, try reducing the volume gradually.

The Last , Please store your device in clean Case, If the hearing aids microphone is covered with wax or debris, it will make a noise.

What to do if your hearing aids don't charge properly?

1. Check the hearing aids is correctly putted into the charging case.

 2.Make sure the charging case has enough power


Item Specifics

  • Condition: New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is ...
  • Number of Settings: 2
  • Hearing Aid Fitting: In the Ear (ITE)
  • Frequency Range: 500Hz~5000Hz
  • FOG50 MAX Gain: 30dB±5dB
  • Power Source: Docking station/ case, Rechargeable Battery
  • Items Included: Hearing Aid Case, Hearing Aid Dome
  • Color: Black
  • Working Voltage: D.C.3.7V
  • Input Noise: E22dB±2dB
  • Maximum Sound Outpu: ≤113dB±3dB
  • Sound Processing: Digital
  • To Fit: Both Ears, Left Ear, Right Ear
  • Brand: K&FCOPTEE
  • Type: Hearing Aid
  • Department: Adult
  • Manufacturer Warranty: See Item Description
  • Labels & Certifications: CE/FDA
  • Changing Type: USB Charging
  • Average OSPL90: 106dB±2dB
  • Features: Digital Noise Reduction, Rechargeable
  • Changer: DC 5V/50MA-1A
  •  

    Processing Time

    • We process and ship orders Monday through Friday, excluding holidays.
    • Most orders are processed within 1–3 business days, depending on product availability.
    • Processing time does not include delivery time, which varies based on your location and the product’s shipping origin.

    Shipping Coverage

    We currently ship to addresses within the United States only.

    Products may ship from:

    • Our U.S. warehouses, or
    • Our international fulfillment centers (including Korea, Japan, China, Australia, Mexico, Canada, the United Kingdom, and the EU).

    Each product page clearly displays the “Ships From” location before checkout.


    Shipping Methods & Estimated Delivery

     

    Shipping Method Estimated Delivery Cost
    Free Shipping (US) 5–10 business days Free, available on eligible items
    Standard Shipping (US to US by Item) 5–10 business days $6.50 for the first item, $3.00 each additional
    Standard Shipping (From US Warehouse by Weight) 3–7 business days Starts at $6.50, increasing by $2 for every additional 4 oz (0.25 lb) up to 1 lb, then by $4 for each additional pound beyond 1 lb.
    Extended Delivery (Ships from Overseas Warehouse) 10–15 business days $14.50 for the first item, $4.00 each additional

    Shipping costs vary by product weight, quantity and origin. Exact rates and delivery estimates are displayed on each product page and confirmed during checkout.

    Free Shipping

    We offer free standard shipping on select products or during promotional periods. Availability of free shipping will be displayed on the product page and at checkout. 


    Carriers

    We primarily use USPS and UPS for U.S. deliveries. Items shipped from international warehouses may be handled by partner carriers depending on the country of origin.


    Import Duties & Taxes

    All import duties and taxes for goods imported into the United States are included in the product price. There are no hidden fees or additional charges at checkout.


    Tracking & Notifications

    Every order is fully trackable. You will receive a tracking number via email once your order ships. If your order ships in multiple packages, each package will have its own tracking number. If you don’t receive a shipping confirmation immediately, your order is still being processed and will arrive within the estimated timeframe shown at checkout.

    You can track your shipment anytime using the Track Your Order page on our website.


    Order Changes & Cancellations

    If you need to modify or cancel an order, please contact our customer support team as soon as possible. Orders can only be canceled before they ship. Once shipped, cancellations are not possible, but you may request a return after the item is delivered.

    Contact: support@ibspot.com


    Item Not Received

    If your tracking number shows “Delivered” but you haven’t received your package:

    1. Check with your local USPS or UPS office.
    2. Confirm that the shipping address provided was correct.
    3. If the issue remains unresolved, contact support@ibspot.com for assistance.

    Damaged or Lost Parcels

    If your package arrives damaged or fails to arrive, please contact us immediately. For deliveries to P.O. boxes, ibspot is not responsible for damage caused by weather, temperature, or theft.


    Customer Support

    For any questions about shipping, tracking, or delivery, our customer support team is here to help.

    Email: support@ibspot.com

    We’re always happy to help.

    Please read our policy carefully before making a purchase.
    We aim to ensure every customer has a smooth and transparent experience with ibspot.com.


    Order Cancellation Policy

    Customers may request to cancel an order before it has been shipped.
    Once the package has been shipped, cancellations are no longer possible; however, you may still request a return after receiving your order.

    How to Request a Cancellation

    You can contact us through:

    Please submit your cancellation request as soon as possible after placing the order to allow us to process it before shipment.


    Return Policy

    We accept returns for most items within 30 days of delivery for a full refund.

    To be eligible for a return:

    • The item must be unused, in the same condition as received, and in its original packaging.

    • A tracking number must be provided to confirm the return shipment.

    Non-Returnable Items

    Certain products cannot be returned, including:

    • Perishable goods (for example, food, flowers, newspapers, magazines)

    • Intimate or sanitary goods

    • Hazardous materials or flammable liquids/gases

    • Gift cards

    • Downloadable software

    • Some health and personal care items

    Partial Refunds (If Applicable)

    Partial refunds may be granted in specific situations, such as:

    • Books with obvious signs of use

    • Opened CDs, DVDs, software, or vinyl records

    • Items not in their original condition, damaged, or missing parts not due to our error

    • Items returned more than 30 days after delivery


    How to Return an Item

    To initiate a return, please contact us at support@ibspot.com with your order number and details about the product you wish to return.
    Our team will provide you with return instructions and a prepaid return label.


    Shipping Cost for Returns

    Please contact us before returning any item.
    We will provide a free return shipping label.

    If a return is sent back without prior contact or without our provided label, we cannot be held responsible for return shipping costs.

    For items valued over $75, we recommend using a trackable shipping service or purchasing shipping insurance.
    We cannot guarantee that we will receive your returned item if shipped independently.


    Refund Processing

    Once your return is received and inspected:

    • In-store returns are refunded to the original form of payment or issued as a gift card.

    • Mail-in returns using our prepaid label are refunded to the original payment method within 3–5 business days after we receive your return.

    Please allow:

    • 5–7 business days for the return to reach our Returns Center.

    • An additional 3–10 business days for your bank to post the refund to your account.


    Damages, Issues & Claims

    Please inspect your order immediately upon receipt.
    If you receive a defective, damaged, or incorrect item, contact us right away at support@ibspot.com.
    We’ll evaluate the issue promptly and make it right.

    Product Claims

    Before purchasing, please review product details carefully.
    If there is a problem with your order upon arrival, visit our Support Center or contact us directly to arrange return shipping or replacement.


    Exchanges

    We do not process direct exchanges.
    The fastest way to get what you need is to return the original item and place a new order once your return is accepted.


    Return Address

    IBSPOT Return Center
    15 Sawmill Ln
    Dover Plains, NY 12522
    United States


    Customer Support

    Our support team is available 24/7 to assist with cancellations, returns, or general inquiries.

    Email: support@ibspot.com
    Contact Form: Contact Us page

    Oops!

    Sorry, it looks like some products are not available in selected quantity.

    OK

    delivery truck
    Fast Delivery

    Global delivery to the US in just days—fast, reliable, and hassle-free service every time!

    safe payment
    Safe Payment

    Pay with the world’s most popular and secure payment methods.

    headphone
    24/7 Help Center

    Round-the-clock assistance for a smooth shopping experience.

    mail return
    100% Satisfaction Guarantee

    30 days return policy if you’re not satisfied with products & services

    Subscribe To Our Newsletter

    Disclaimer: Statements made, or products sold through this website, have not been evaluated by the United States Food and Drug Administration. Products are not intended to diagnose, treat, cure or prevent any disease.