LUFFWELL Runner for Yard, 100FT Long Lead With 15FT Pulley Tie Out Cable for Heavy Duty Dogs Up to 250LBS, Trolley System for Large Dogs in Yard, Park and Outside, Silver
LUFFWELL Runner for Yard, 100FT Long Lead With 15FT Pulley Tie Out Cable for Heavy Duty Dogs Up to 250LBS, Trolley System for Large Dogs in Yard, Park and Outside, Silver
LUFFWELL Runner for Yard, 100FT Long Lead With 15FT Pulley Tie Out Cable for Heavy Duty Dogs Up to 250LBS, Trolley System for Large Dogs in Yard, Park and Outside, Silver
- HEAVY DUTY TROLLEY RUNNER SYSTEM: The dog runner system have 200ft dog leads and 15ft dog tie out cable, both of the dog run cable are made of stainless steel with vinyl-coated to protect against corrosion and rust, to ensure durable and long lasting use. Turnbuckle design to adjust the length and tension, while avoiding sagging and helping dog clasp slide smoothly along the cable, to make your dog run free and happiness.
- TIE OUT CABLE WITH SHOCK ABSORBING SPRING: Our dog tie out cable for yard it's different from others, the shock absorbing spring located on the dog runner zip line, help your dog reduce the tension more directly to prevent your pet from injury, the dog run cable provide nearly 2000 square feet of playing area to explore and play, give your pets more freedom with safety and security.
- DOG LEADS WITH TANGLE FREE COLLAR CLIP: Dog leads with 360 tangle free swivel collar clip and 2 stopper, 360 tangle free clip to gives dogs more freedom and safe, but also durable enough to withstand the most intense pulling. Stoppers can create a safe distance from the anchor points, effectively prevent dog from wrapping itself around the obstacle like tree or post, etc.
- BETTER IDEALS DOG CABLE FOR OUTSIDE: The dog run cable for outside is sturdy to holding up to dogs running and pulling to keep them safely in sight, minimize the chances of your pooch getting strangled or wrapped around trees, posts. you eliminate the need to check your dog several times a day to untangle him, but without the fear of them running off. Our dog zipline it's a good ideal for backyard, camping, outdoor activity, travel and more.
- EASY TO INSTALL DOG ZIPLINE SYSTEM: LUFFWELL dog trolley runner system comes with all components needed for a fast and easy to install, also include a detailed Installation Instructions, if you have any concerns just contact us for free, we will help you to solve your problem as soon as possible.
Brand: | LUFFWELL |
---|---|
Size: | 100FT+15FT |
Color: | Silver |
Manufacturer: | Joyrally Inc |
Part Number: | PJQDCLY |
Isin: | ICH6VDTTESAX |

IBspot Buyer Protection
Shop confidently on IBspot, receive your item as described or your money back for eligible orders. Learn Program Terms

GUARANTEED SAFE CHECKOUT
-
MONEY BACK GUARANTEE
30 days money back guarantee, no additional fee charged.
-
EXCELLENT SUPPORT
We provide 24/7 online customer support via email.
-
Fast Shipping
One week domestic shipping. Global delivery to the US in 2 weeks.
LUFFWELL Dog Trolley System
Dogs are always full of energy, especially in yard,parks, beaches, forests, camping, adventures, and outdoor activities.
But when we are outdoors and we have to leave our dogs for some minutes, and we want them to stay in the location to wait us back.
Or when we fish by the lake, cook in the forest, build tents in the wild, or sun bathe on the beach, they may not be sitting with us, when we don't pay attention, they may get lost in the wild. So you just need a long and strong dog lead spike cable to keep your dog's range of activities or the safety of people around.
A trusty anchor to keep pets safe and secure with LUFFWELL Dog Trolley System!
Product Detail
1. 50ft/100ft/120ft/150ft/200ft dog aerial dog runner tie out cable and 10ft/15ft dog runner line ,let dog run outside
2. 360-degree swivel aviation aluminum carbine clips allows for wider roaming without tangling
3. 50ft/100ft/120ft/150ft/200ft galvanized steel leash is coated with crack-resistant poly vinyl to stay strong against pulling, weatherproof chrome-plated coating to prevent rust, and easy to clean.
4.Comes with a thoughtful sturdy oxford carry bag for easy storage.
Specifications:
Material:chrome plating carbon steel wire
Color:Red
dog leash length: 50ft/100ft/120ft/150ft/200ft;
dog leads cable length: 10ft/15ft;
Fit Dog Sizes: up to 250lbs
package included:
1 x aerial tie out cable with pulley
1 x runner line with Tighten Hook
2 x stopper
2 x screw hook
2 x U-shape Clamp
1 x oxford carry bag
Shipping Summary:
- Packages are shipped from Monday to Friday.
- The usual time for processing an order is 1 to 3 business days, but may vary depending on the availability of products ordered. This period excludes delivery times, which depend on your geographic location.
- We provide tracking for every order. Tracking will be available once your product is shipped. Each individual product may be shipped from different fulfillment centers across the globe as our product research team spends the time to source quality yet affordable products.
Estimated delivery times:
- Standard Shipping: 3-7 business days
- Expedited Shipping: 2-5 business days
- International Shipping: 10 - 15 business days
Please note that these are estimates, not guarantees. Delivery time depends on a number of variables, and there may be delays such as bad weather affecting air transport, or a package being held for inspection by Customs. ibspot is not liable for any delays in international transportation or customs clearance.
Shipments can be delivered directly to most addresses, except post office boxes. However, in certain remote areas, there may be an additional delivery charge or you may need to pick up your package from the closest service location of ibspot's shipping partner.
Shipping Status:
As soon as your order ships, you'll receive a shipping confirmation email that includes your tracking number.
If you don't receive a shipping confirmation email right away, don't worry! We know the delivery date or date range provided at checkout and we'll be sure to deliver the items within that timeframe.
Order changes:
Please contact our customer support if the order needs to be canceled or modified.
Item not received:
If you've successfully placed an order and haven't received it yet while the tracking status shows it's delivered. you'd wish to contact the carrier to hunt the packages. Once a package is marked “Delivered” by the carrier, we are no longer responsible for lost or stolen items. Please ensure you provide a secure delivery address.
Damaged Parcel
If your package has been delivered in a PO Box, please note that we are not responsible for any damage that may result (consequences of extreme temperatures, theft, etc.).
If you have any questions regarding shipping or want to know about the status of an order, please contact us or email to support@ibspot.com.
Please Read Our Return & Refund Policy Carefully:
Return:
You may return most items within 30 days of delivery for a full refund.
To be eligible for a return, your item must be unused and in the same condition that you received it. It must also be in the original packaging.
Several types of goods are exempt from being returned. Perishable goods such as food, flowers, newspapers or magazines cannot be returned. We also do not accept products that are intimate or sanitary goods, hazardous materials, or flammable liquids or gases.
Additional non-returnable items:
- Gift cards
- Downloadable software products
- Some health and personal care items
To complete your return, we require a tracking number, which shows the items which you already returned to us.
There are certain situations where only partial refunds are granted (if applicable)
- Book with obvious signs of use
- CD, DVD, VHS tape, software, video game, cassette tape, or vinyl record that has been opened
- Any item not in its original condition, is damaged or missing parts for reasons not due to our error
- Any item that is returned more than 30 days after delivery
Items returned to us as a result of our error will receive a full refund,some returns may be subject to a restocking fee of 7% of the total item price, please contact a customer care team member to see if your return is subject. Returns that arrived on time and were as described are subject to a restocking fee.
Items returned to us that were not the result of our error, including items returned to us due to an invalid or incomplete address, will be refunded the original item price less our standard restocking fees.
You should expect to receive your refund within four weeks of giving your package to the return shipper, however, in many cases you will receive a refund more quickly. This time period includes the transit time for us to receive your return from the shipper (5 to 10 business days), the time it takes us to process your return once we receive it (3 to 5 business days), and the time it takes your bank to process our refund request (5 to 10 business days).
If you need to return an item, please Contact Us with your order number and details about the product you would like to return. We will respond quickly with instructions for how to return items from your order.
Shipping Cost
We'll pay the return shipping costs if the return is a result of our error (you received an incorrect or defective item, etc.). In other cases, you will be responsible for paying for your own shipping costs for returning your item. Shipping costs are non-refundable. If you receive a refund, the cost of return shipping will be deducted from your refund.
Depending on where you live, the time it may take for your exchanged product to reach you, may vary.
If you are shipping an item over $75, you should consider using a trackable shipping service or purchasing shipping insurance. We don’t guarantee that we will receive your returned item.
Refund:
- Purchases may be returned within 30 days of the shipping date for a refund.
- Refund will be issued to your original form of payment.
- Refunds for orders purchased with IBSPOT Gift Cards and/or IBSPOT Notes will be issued as a IBSPOT Gift Card and mailed to the original billing address. Gift cards cannot be redeemed for cash unless required by law.
Refund Processing
• Returns to a IBSPOT store will be refunded to the original form of payment or gift card. • Mail-in returns with our prepaid return label will be refunded back to the original form of payment within 3-5 business days after we receive your return. Please allow 5-7 business days for your return to arrive at our Returns Center.
• Note: It may take a few days until your bank posts the refund to your account.
Claims:
Claims related to the product. Be sure to check the details of your purchase carefully before you make the payment, and check the contents of the package(s) promptly upon receipt. If you have a problem with the product, visit our Support Center to find out about return shipping arrangements.
WHICH CIRCUMSTANCES WE OFFER RETURND & REFUND:
WRONG PRODUCT:
If you discover your order is flawed please contact us Mail: support@ibspot.com. With photos of the wrong product we will providing a return shipping label. Once it is tracking we will ship a replacement a product immediately.
Damages and issues
Please inspect your order upon reception and contact us immediately if the item is defective, damaged or if you receive the wrong item, so that we can evaluate the issue and make it right.
Exceptions / non-returnable items
Certain types of items cannot be returned, like perishable goods (such as food, flowers, or plants), custom products (such as special orders or personalized items), and personal care goods (such as beauty products). We also do not accept returns for hazardous materials, flammable liquids, or gases. Please get in touch if you have questions or concerns about your specific item. Unfortunately, we cannot accept returns on sale items or gift cards.
Exchanges
The fastest way to ensure you get what you want is to return the item you have, and once the return is accepted, make a separate purchase for the new item.
Oops!
Sorry, it looks like some products are not available in selected quantity.