USS New York LPD-21 Patch – Sew On
USS New York LPD-21 Patch – Sew On
USS NEW YORK LPD-21 Patch - Sew On
Sailors! Enjoy this beautifully embroidered USS NEW YORK LPD-21 Patch. You'll love displaying or wearing it on a jacket!
- 4.5" inches
- Sew On
- US Naval Veteran-Owned Business
USS New York (LPD-21) is a San Antonio-class amphibious transport dock and the fifth ship of the United States Navy to be named after the state of New York.
Naming
Shortly after September 11 2001, Governor of New York George E. Pataki wrote a letter to Secretary of the Navy Gordon R. England requesting that the Navy bestow the name "New York" on a surface warship involved in the Global War on Terrorism in honor of the victims of the September 11 attacks. In his letter, the Governor said he understood state names were reserved for submarines but asked for special consideration so the name could be given to a surface ship.[6] The request was approved on 28 August 2002.
Sister ships names announced
On 9 September 2004 Gordon R. England, then the Deputy Secretary of Defense, announced that two of New York's sister ships would be named Arlington and Somerset in commemoration of the places where two of the other planes used in the attack came down: Arlington County, Virginia, and Somerset County, Pennsylvania.
Construction
A symbolic amount of steel salvaged from the World Trade Center after it was destroyed in the September 11 attacks was used in her construction.
The ship is the first to be designed fully from the CAD-screen up to support all of the Marines' primary mobility capabilities—Landing Craft Air Cushion and MV-22B Osprey.
7.5 short tons (6.8 t) of the steel used in the ship's construction came from the rubble of the World Trade Center; this represents less than one thousandth of the total weight of the ship. The steel was melted down at Amite Foundry and Machine in Amite, Louisiana, to cast the ship's bow section. It was poured into the molds on 9 September 2003, with 7 short tons (6.4 t) cast to form the ship's "stem bar"—part of the ship's bow. The foundry workers reportedly treated it with "reverence usually accorded to religious relics," gently touching it as they walked by. One worker delayed his retirement after 40 years of working to be part of the project.
Christening and delivery
New York was christened on 1 March 2008, in a ceremony at Avondale Shipyard in New Orleans. Dotty England, the ship's sponsor, smashed the traditional champagne bottle on the ship's bow and christened the ship New York. Several dignitaries were in attendance, including Louisiana Congressman William J. Jefferson, Deputy Defense Secretary Gordon R. England, members of the New York City Police Department and the New York City Fire Department, and family members of 11 September victims. The champagne bottle did not break the first time it was struck against the hull of the ship, but the second attempt was successful.
The ship was delivered to the Navy on 21 August 2009 at New Orleans. She set sail for Norfolk, Virginia, on 13 October 2009. On 2 November 2009 the ship passed the World Trade Center site for the first time and gave the site a 21-gun salute.
Commissioning and trials
The ship commissioning of USS New York took place on 7 November 2009, in New York City. Speakers included Secretary of State Hillary Clinton, Secretary of the Navy Ray Mabus, Gov. David Paterson, Mayor Michael Bloomberg, Chief of Naval Operations Admiral Gary Roughead, and Commandant of the Marine Corps General James T. Conway. Approximately one in seven of the plank owners are from New York state, a larger number than usual.
Propulsion
USS New York uses four Fairbanks-Morse license-built MAN Colt-Pielstick PC2.5 STC sequentially turbocharged marine diesel engines with inboard rotating Rolls-Royce controllable-pitch propellers. The V16-cylinder Colt-Pielstick PC2.5 STC engine is intended for use on ships requiring high propulsion power combined with a lightweight installation. Each V16 PC2.5 STC diesel engine weighs 84 metric tons (83 long tons) dry without flywheel.
On 11 January 2010, the Navy announced that the ship would have to undergo repairs for faulty engine parts after inspectors discovered the "premature failure" of bearings on the ship's main propulsion diesel engines during a week-long sea trial following the November commissioning.
Service history
2012
On 10 June 2012 the ship was deployed for the first time to the Strait of Hormuz and the Persian Gulf region.[20] She deployed with Marines from 1st Battalion, 2nd Marine Regiment, 2nd Marine Division and returned in December 2012 along with the USS Iwo Jima and the USS Gunston Hall with Marines from the same unit attached to all three ships.
2013
In late 2013, the New York shifted homeport from Norfolk to Naval Station Mayport in Florida, as part of the Iwo Jima ARG move.
2014
In June 2014, the ship was used to transport Ahmed Abu Khattala, suspected mastermind of the 2012 Benghazi attack on the American diplomatic mission at Benghazi, back to the United States.
2017
In September 2017, the New York arrived off the Florida coast for Hurricane Irma relief, 16 years to the day after the 9/11/2001 terrorist attacks.
| Isin: | I0WGBM1N74DY |
|---|
IBspot Buyer Protection
Shop confidently on IBspot, receive your item as described or your money back for eligible orders. Learn Program Terms
GUARANTEED SAFE CHECKOUT
-
MONEY BACK GUARANTEE
30 days money back guarantee, no additional fee charged.
-
EXCELLENT SUPPORT
We provide 24/7 online customer support via email.
-
Fast Shipping
One week domestic shipping. Global delivery to the US in 2 weeks.
USS NEW YORK LPD-21 Patch - Sew On
Sailors! Enjoy this beautifully embroidered USS NEW YORK LPD-21 Patch. You'll love displaying or wearing it on a jacket!
- 4.5" inches
- Sew On
- US Naval Veteran-Owned Business
USS New York (LPD-21) is a San Antonio-class amphibious transport dock and the fifth ship of the United States Navy to be named after the state of New York.
Naming
Shortly after September 11 2001, Governor of New York George E. Pataki wrote a letter to Secretary of the Navy Gordon R. England requesting that the Navy bestow the name "New York" on a surface warship involved in the Global War on Terrorism in honor of the victims of the September 11 attacks. In his letter, the Governor said he understood state names were reserved for submarines but asked for special consideration so the name could be given to a surface ship.[6] The request was approved on 28 August 2002.
Sister ships names announced
On 9 September 2004 Gordon R. England, then the Deputy Secretary of Defense, announced that two of New York's sister ships would be named Arlington and Somerset in commemoration of the places where two of the other planes used in the attack came down: Arlington County, Virginia, and Somerset County, Pennsylvania.
Construction
A symbolic amount of steel salvaged from the World Trade Center after it was destroyed in the September 11 attacks was used in her construction.
The ship is the first to be designed fully from the CAD-screen up to support all of the Marines' primary mobility capabilities—Landing Craft Air Cushion and MV-22B Osprey.
7.5 short tons (6.8 t) of the steel used in the ship's construction came from the rubble of the World Trade Center; this represents less than one thousandth of the total weight of the ship. The steel was melted down at Amite Foundry and Machine in Amite, Louisiana, to cast the ship's bow section. It was poured into the molds on 9 September 2003, with 7 short tons (6.4 t) cast to form the ship's "stem bar"—part of the ship's bow. The foundry workers reportedly treated it with "reverence usually accorded to religious relics," gently touching it as they walked by. One worker delayed his retirement after 40 years of working to be part of the project.
Christening and delivery
New York was christened on 1 March 2008, in a ceremony at Avondale Shipyard in New Orleans. Dotty England, the ship's sponsor, smashed the traditional champagne bottle on the ship's bow and christened the ship New York. Several dignitaries were in attendance, including Louisiana Congressman William J. Jefferson, Deputy Defense Secretary Gordon R. England, members of the New York City Police Department and the New York City Fire Department, and family members of 11 September victims. The champagne bottle did not break the first time it was struck against the hull of the ship, but the second attempt was successful.
The ship was delivered to the Navy on 21 August 2009 at New Orleans. She set sail for Norfolk, Virginia, on 13 October 2009. On 2 November 2009 the ship passed the World Trade Center site for the first time and gave the site a 21-gun salute.
Commissioning and trials
The ship commissioning of USS New York took place on 7 November 2009, in New York City. Speakers included Secretary of State Hillary Clinton, Secretary of the Navy Ray Mabus, Gov. David Paterson, Mayor Michael Bloomberg, Chief of Naval Operations Admiral Gary Roughead, and Commandant of the Marine Corps General James T. Conway. Approximately one in seven of the plank owners are from New York state, a larger number than usual.
Propulsion
USS New York uses four Fairbanks-Morse license-built MAN Colt-Pielstick PC2.5 STC sequentially turbocharged marine diesel engines with inboard rotating Rolls-Royce controllable-pitch propellers. The V16-cylinder Colt-Pielstick PC2.5 STC engine is intended for use on ships requiring high propulsion power combined with a lightweight installation. Each V16 PC2.5 STC diesel engine weighs 84 metric tons (83 long tons) dry without flywheel.
On 11 January 2010, the Navy announced that the ship would have to undergo repairs for faulty engine parts after inspectors discovered the "premature failure" of bearings on the ship's main propulsion diesel engines during a week-long sea trial following the November commissioning.
Service history
2012
On 10 June 2012 the ship was deployed for the first time to the Strait of Hormuz and the Persian Gulf region.[20] She deployed with Marines from 1st Battalion, 2nd Marine Regiment, 2nd Marine Division and returned in December 2012 along with the USS Iwo Jima and the USS Gunston Hall with Marines from the same unit attached to all three ships.
2013
In late 2013, the New York shifted homeport from Norfolk to Naval Station Mayport in Florida, as part of the Iwo Jima ARG move.
2014
In June 2014, the ship was used to transport Ahmed Abu Khattala, suspected mastermind of the 2012 Benghazi attack on the American diplomatic mission at Benghazi, back to the United States.
2017
In September 2017, the New York arrived off the Florida coast for Hurricane Irma relief, 16 years to the day after the 9/11/2001 terrorist attacks.
- Type: Patch
- Force: Navy
- Theme: Militaria
Processing Time
- We process and ship orders Monday through Friday, excluding holidays.
- Most orders are processed within 1–3 business days, depending on product availability.
- Processing time does not include delivery time, which varies based on your location and the product’s shipping origin.
Shipping Coverage
We currently ship to addresses within the United States only.
Products may ship from:
- Our U.S. warehouses, or
- Our international fulfillment centers (including Korea, Japan, China, Australia, Mexico, Canada, the United Kingdom, and the EU).
Each product page clearly displays the “Ships From” location before checkout.
Shipping Methods & Estimated Delivery
| Shipping Method | Estimated Delivery | Cost |
|---|---|---|
| Free Shipping (US) | 5–10 business days | Free, available on eligible items |
| Standard Shipping (US to US by Item) | 5–10 business days | $6.50 for the first item, $2.00 each additional |
| Standard Shipping (From US Warehouse by Weight) | 3–7 business days | Starts at $6.50, increasing by $2 for every additional 4 oz (0.25 lb) up to 1 lb, then by $4 for each additional pound beyond 1 lb. |
| Extended Delivery (Ships from Overseas Warehouse) | 10–20 business days | $14.50 for the first item, $2.00 each additional |
Shipping costs vary by product weight, quantity and origin. Exact rates and delivery estimates are displayed on each product page and confirmed during checkout.
Free Shipping
We offer free standard shipping on select products or during promotional periods. Availability of free shipping will be displayed on the product page and at checkout.
Carriers
We primarily use USPS and UPS for U.S. deliveries. Items shipped from international warehouses may be handled by partner carriers depending on the country of origin.
Import Duties & Taxes
All import duties and taxes for goods imported into the United States are included in the product price. There are no hidden fees or additional charges at checkout.
Tracking & Notifications
Every order is fully trackable. You will receive a tracking number via email once your order ships. If your order ships in multiple packages, each package will have its own tracking number. If you don’t receive a shipping confirmation immediately, your order is still being processed and will arrive within the estimated timeframe shown at checkout.
You can track your shipment anytime using the Track Your Order page on our website.
Order Changes & Cancellations
If you need to modify or cancel an order, please contact our customer support team as soon as possible. Orders can only be canceled before they ship. Once shipped, cancellations are not possible, but you may request a return after the item is delivered.
Contact: support@ibspot.com
Item Not Received
If your tracking number shows “Delivered” but you haven’t received your package:
- Check with your local USPS or UPS office.
- Confirm that the shipping address provided was correct.
- If the issue remains unresolved, contact support@ibspot.com for assistance.
Damaged or Lost Parcels
If your package arrives damaged or fails to arrive, please contact us immediately. For deliveries to P.O. boxes, ibspot is not responsible for damage caused by weather, temperature, or theft.
Customer Support
For any questions about shipping, tracking, or delivery, our customer support team is here to help.
Email: support@ibspot.com
We’re always happy to help.
Please read our policy carefully before making a purchase.
We aim to ensure every customer has a smooth and transparent experience with ibspot.com.
Order Cancellation Policy
Customers may request to cancel an order before it has been shipped.
Once the package has been shipped, cancellations are no longer possible; however, you may still request a return after receiving your order.
How to Request a Cancellation
You can contact us through:
- Email: support@ibspot.com
- Contact Form: Submit a request through our Contact Us page
Please submit your cancellation request as soon as possible after placing the order to allow us to process it before shipment.
Return Policy
We accept returns for most items within 30 days of delivery for a full refund.
To be eligible for a return:
- The item must be unused, in the same condition as received, and in its original packaging.
- A tracking number must be provided to confirm the return shipment.
Non-Returnable Items
Certain products cannot be returned, including:
- Perishable goods (for example, food, flowers, newspapers, magazines)
- Intimate or sanitary goods
- Hazardous materials or flammable liquids/gases
- Gift cards
- Downloadable software
- Some health and personal care items
Partial Refunds (If Applicable)
Partial refunds may be granted in specific situations, such as:
- Books with obvious signs of use
- Opened CDs, DVDs, software, or vinyl records
- Items not in their original condition, damaged, or missing parts not due to our error
- Items returned more than 30 days after delivery
How to Return an Item
To initiate a return, please contact us at support@ibspot.com with your order number and details about the product you wish to return.
Our team will provide you with return instructions and a prepaid return label.
Shipping Cost for Returns
Please contact us before returning any item.
We will provide a free return shipping label.
If a return is sent back without prior contact or without our provided label, we cannot be held responsible for return shipping costs.
For items valued over $75, we recommend using a trackable shipping service or purchasing shipping insurance.
We cannot guarantee that we will receive your returned item if shipped independently.
Refund Processing
Once your return is received and inspected:
- In-store returns are refunded to the original form of payment or issued as a gift card.
- Mail-in returns using our prepaid label are refunded to the original payment method within 3–5 business days after we receive your return.
Please allow:
- 5–7 business days for the return to reach our Returns Center.
- An additional 3–10 business days for your bank to post the refund to your account.
Damages, Issues & Claims
Please inspect your order immediately upon receipt.
If you receive a defective, damaged, or incorrect item, contact us right away at support@ibspot.com.
We’ll evaluate the issue promptly and make it right.
Product Claims
Before purchasing, please review product details carefully.
If there is a problem with your order upon arrival, visit our Support Center or contact us directly to arrange return shipping or replacement.
Exchanges
We do not process direct exchanges.
The fastest way to get what you need is to return the original item and place a new order once your return is accepted.
Return Address
IBSPOT Return Center
15 Sawmill Ln
Dover Plains, NY 12522
United States
Customer Support
Our support team is available 24/7 to assist with cancellations, returns, or general inquiries.
Email: support@ibspot.com
Contact Form: Contact Us page
Oops!
Sorry, it looks like some products are not available in selected quantity.